IIC Micro Mill Project – Maintenance Shutdown
Project Data & EL-Mahd Responsibility
IIC was established in 2010 and acquired its first plant in Alexandria in 2011 with a designed capacity of 300,000 tons/yr steel wire rod; the plant was recently rehabilitated and commenced its operations in 2014. In 2016 IIC Beni Suef plant started operating with a designed capacity of 830,000 Tons per year, of which 530,000 in steel rebar and 300,000 in steel billets, using Danieli’s latest technology, IIC has contracted the prominent companies in the field “Danieli” and “Sider Engineering’ to rehabilitate its production facility and add new sizes ranging from 5.5 to 12 mm wire rod. Moreover, a new rebar rolling facility is now operational, designed to produce rebar sizes ranging from 16.0mm to 32.0mm considering the maximum utilization of the existing equipment.
The Scope Of Work
Providing Qualified Technicians for maintenance shut-down assignments.
Sandblasting and painting for CCM mechanical equipment.
Primary/Secondary single wall Ducts replacement, Fabrication and installation.
Cooling Ducts Replacement, Assembly and installation.
Provide the required lifting tools/equipment.
Provide the required generator for the activities.
Provide the required scaffolding.
Provide all of the special tools for cutting and welding
Provide argon gas and all of the consumables.