Project Data & EL-Mahd Responsibility

The mosque is located on Smouha, the mosque is located on an area of ​​10.4 acres in the wooded forest. The integrated project is divided into a mosque built on an area of ​​2,135 square meters, with a capacity of 1800 prayer rooms, The mosque includes 3 buildings for event halls that can accommodate 3,500 people and consist of 11 funeral halls for men and 11 funeral halls for women, as well as buildings for stores, toilets and others. The mosque is distinguished by the architectural styles of the minarets and domes of mosques that were established in the 14 mosques in the development areas of the Mahmoudiyah axis.

El-Mahd Company obtained a contract to construct a firefighting system and a central air conditioning system for all event halls with all related sub-mechanical activities such as (unloading and storing materials, manufacturing, painting, installation, Pre- commissioning and commissioning.

El-Mahd start employing the qualified direct/indirect manpower, planned and put in action all the related activities for the piping execution starting by the preparation of the project start-up technical document such (work method statements, QA-QC plan, WPS/PQR’s, ITP, risk assessments, …. ETC), the material unloading, site fabrication, installation, pressure testing, pre-commissioning and commissioning with the maximum level of safety and quality using the provided resources such as the lifting tools, PPE, generators, welding sets, air compressors… ETC.

The Scope Of Work

The scope of work was mainly the fire-fighting network, including pump rooms, mechanical systems for the central ventilation and air conditioning network, as well as air handling rooms. Where El-Mahd Company carries out all related activities, starting from receiving raw materials from the customer’s warehouses, then fabricating directly in the erection area, passing through the basic paint work, then installing the entire pipeline network with all its mechanical accessories, including pumps, supports and valves. Final paints with the highest level of safety and quality.

El-Mahd Company has achieved the desired target of completing the project, supported by professional records and conformity reports, in accordance with the professionally planned project schedule that matches the client’s conditions.

Project Gallery

Release Date

April 2020

Client

Egyptian Ministry Of Defense

Main Contractor

GIECO

Location

Alexandria - Egypt